The Project consists of the installation of approximately 6,200 linear feet of 6-inch high pressure steel gas main, 5,600 linear feet of 4-inch polyethylene gas main, 325 linear feet of 2-inch high pressure steel gas main, untrenched installation, line valves, connections, services changeovers, regulator station installation and related appurtenances. The Project also contains an Alternate Bid consisting of approximately 2,900 linear feet of 6-inch high-pressure steel gas main, 2,300 linear feet of 4-inch polyethylene gas main, 325 linear feet of 2-inch high-pressure steel gas main, untrenched installation, line valves, connections, services changeovers, regulator station installation and related appurtenances.
Estimated Pipeline Length:
1 Pipeline Length is submitted by the user. 2 Affected Counties are the counties construction is taking place. 3 Estimated Pipeline Length is calculated by the system based on the pipeline drawn on the map.