GC1 # 17871

Gas Company:
BUFORD GAS SYSTEM, CITY OF
Title:
49 Heartwood Way, Braselton, Ga.
Home State:
Georgia
Home County:
Fulton
Certificate Number:
121
Construction Type:
New Construction
Submitted By:
BUFORD GAS SYSTEM, CITY OF
Submission Date:
2024-06-05T08:40:34.7071302
Pipeline Length 1:
100 feet
Pipeline Diameter:
1
Pipeline Type:
Plastic
Pressure:
40 psig
Start Date:
2024-06-21T00:00:00
End Date:
2024-07-05T00:00:00
Affected Counties 2:
Jackson
Receipt Number:
8ce1137d-7b89-4172-b310-d2cf43825478
Status:
Accepted
Comments:
Installing new gas service line
Estimated Pipeline Length:
1 Pipeline Length is submitted by the user.
2 Affected Counties are the counties construction is taking place.
3 Estimated Pipeline Length is calculated by the system based on the pipeline drawn on the map.