GC1 # 17888

Gas Company:
Atlanta Gas Light
Title:
HEMINGWAY
Home State:
Georgia
Home County:
Cherokee
Certificate Number:
Construction Type:
New Construction
Submitted By:
Atlanta Gas Light
Submission Date:
2024-06-10T10:25:50.2167611
Pipeline Length 1:
9003 feet
Pipeline Diameter:
4
Pipeline Type:
Plastic
Pressure:
60 psig
Start Date:
2024-06-25T00:00:00
End Date:
2024-12-31T00:00:00
Affected Counties 2:
Forsyth
Receipt Number:
e9e89212-6019-4fe3-bb69-a3057366a323
Status:
Accepted
Comments:
INSTALL 3037 FT OF 6'' PLASTICAND 5374 FT OF 2'' PLASTIC AND 592 FT OF 4'' STEEL TO SERVE NEW COMMUNITY
Estimated Pipeline Length:
1 Pipeline Length is submitted by the user.
2 Affected Counties are the counties construction is taking place.
3 Estimated Pipeline Length is calculated by the system based on the pipeline drawn on the map.