GC1 # 19660

Gas Company:
Atlanta Gas Light Company
Title:
Augusta #3 Regulator Station Renewal
Home State:
Georgia
Home County:
Fulton
Certificate Number:
Construction Type:
Reconstruction
Submitted By:
Atlanta Gas Light Company
Submission Date:
2026-06-15T11:34:22.5257125
Pipeline Length 1:
125' feet
Pipeline Diameter:
5
Pipeline Type:
Steel
Pressure:
300 psig
Start Date:
2026-06-25T00:00:00
End Date:
2026-09-01T00:00:00
Affected Counties 2:
Richmond
Receipt Number:
ceb051e0-c5f4-440b-9de0-1d21e0558bbd
Status:
Accepted
Comments:
We will be renewing the 8" steel main (90' total) and the 12" steel main (35' total). The 8" line has NOP of 140# and the 12" line NOP is 290#. This location is beside the Kinder Morgan station and office in Hephzibah, Ga.
Estimated Pipeline Length:
1 Pipeline Length is submitted by the user.
2 Affected Counties are the counties construction is taking place.
3 Estimated Pipeline Length is calculated by the system based on the pipeline drawn on the map.