We will be renewing the 8" steel main (90' total) and the 12" steel main (35' total). The 8" line has NOP of 140# and the 12" line NOP is 290#. This location is beside the Kinder Morgan station and office in Hephzibah, Ga.
Estimated Pipeline Length:
1 Pipeline Length is submitted by the user. 2 Affected Counties are the counties construction is taking place. 3 Estimated Pipeline Length is calculated by the system based on the pipeline drawn on the map.